Yes, please click “Read More” for details.
Installation
The factory joint MUST be installed in the floor. Click “Read More” for details.
consider tightening the triangles, whilst maintaining the proper height based on the overhang or use t-splices and end kits for downspouts so you do not have to use extra cable coming back up
When using a relay for your installation, its important to note that each relay will need its own dedicated 20 amp circuit.
Follow these simple instructions to install the floor sensor probe. Click “Read More” for details.
Click “Read More” for instructions to install your GIT-1 sensor.
This Relay-25 fits in a standard single gang box. It is used in conjunction with the 4iE® Smart thermostat series as well as the Tempo thermostat, in order to expand the original 15 amp capacity. It is specifically designed for large applications beyond 800 sqft.
If it is not installed in the floor, the joint may give and your system will no longer work. Not only will your warranty be voided but you will have to repair the joint and place it back into the floor. The joint connects the heated wire to the unheated lead. NEVER leave the factory joint exposed to air and do not place it in or behind the wall.