Home / Installation / DCM-PRO Peel-And-Stick Membrane

Should we roll the membrane?


The membrane should be pressed down onto the floor for it to bond, this can be done by walking over it or with a roller. 

Tip from Warmup: Putting a bag of thinset (50 lbs) works but body weight traffic is even better at 150-200 lbs.