First, what is self leveler? Self-leveler is required to allow installation of small format tiles and other floor types such as glue-down wood and LVT’s, to be laid on top of the DCM-PRO System. When used, it must be a single pour, at least 10mm deep measured from the top of the castellation (total ½” […]
DCM-PRO Cable
Home / Bathroom Collection
The Warmup DCM-PRO Cable is a custom designed cable compatible with all uncoupling membranes. It can be installed at 2, 3 or 4 pegs. The cable itself allows primary heating thanks to the twin-core ETFE cable, for highest output. It is guaranteed 30-years. Even better results when used with Warmup 4iE Smart WiFi programmable thermostat.
Both 120Vac and 240Vac Warmup heating cable(s) output the same amount of power (wattage) per square foot (13.1 watts), so, the only difference between 120Vac and 240Vac heating cable(s) is the amount (ft2) of heating cable you can attach to one 15A thermostat.
You should never cross underfloor heating cables. This post will link you to some solutions for avoiding heating cable crossing.
Are you installing the DCM-PRO cable without the DCM-PRO membrane? You will need fixing strips. This post tells you how many for each cable size.
Are you looking for troubleshooting support at your home? We are here to help online and by phone 24 hours, 7 days a week.
Warmup thermostats are dual-voltage but must be wired to match the heaters voltage. Learn more about voltage and thermostat wiring in this post.
Are you wondering how long after installation you have to wait to begin using your floor heating system? Learn all about wait time in this post.
Are you experiencing uncertainty with your underfloor heating and looking to get answers? An infrared thermal camera may be the tool you need.
Are you wondering whether or not underfloor heating can deliver enough heat to be a primary heat source? Learn all about it here!
If you are installing small format tiles over the DCM-PRO system you’ll want to read this post to find special instructions.
If you are installing the DCM-PRO cable in your home you may be wondering about the diameter of the cable? Find this information and more here.
When installing sheets of Warmup membrane, you should try your best to install with no overlapping or large gaps.
This page explains how to determine which voltage to run to your DCM-PRO heating system.
Outlined description of when to test your DCM-PRO cable and why you should do it.
This page explains the positioning of the factory joint to ensure a successful installation of your Warmup heating system.
The conductor cores and ground braid of the 10′ cold lead are factory joined in a water resistant joint assembly to each supply conductor and ground conductor of the unheated lead.
The cold tail lead and the sensor probe should be run in separate conduits. This will prevent any interference from the cold tail lead affecting the temperature readings from the sensor probe.
This page describes the composition of the DCM-PRO cable and the different components that make up this heating system.
This page explains the DCM-PRO spacing guidelines and recommendations.
Bathroom Collection
- 4iE Smart WiFi Thermostat
- DCM-PRO Cable
- DCM-PRO Fleece-Back Membrane
- DCM-PRO Peel-And-Stick Membrane
- DCM-PRO Waterproofing Kit
- Energy-Monitoring Thermostat
- Loose Wire – NADWS
- Mirror Defoggers
- StickyMat System – DWM
- Tempo Thermostat
- TH115 Floor Heating Thermostat
- Towel Warmers
- UCCG-4991 Floor Heating Thermostat
- Ultralight Insulation Boards
Floor Heating
- DCM-PRO Cable
- DCM-PRO Fleece-Back Membrane
- DCM-PRO Peel-And-Stick Membrane
- DCM-PRO Waterproofing Kit
- Dual Cable Tester
- Fixing Band
- Foil Heating System – FOIL
- Loose Wire – NADWS
- StickyMat System – DWM
- Ultralight Insulation Boards
- Warmup Inslab Cable – INSLAB
- Watchdog
Insulation
Outdoor Controllers
- APS-3C
- CDP 2 Remote Control
- COMMBOX-600
- DS 5 Outdoor Snow Melting Controller
- DS 8 Outdoor Snow Melting Controller
- DS 9 Outdoor Snow Melting Controller
- DS-2C Outdoor Snow Melting Controller
- ETO2 Snow and Ice Melting Controller
- ETO3 Outdoor Snow Melting Controller
- GF 1 and GF 2
- GF-PRO
- PRO-REMOTE
- SNOPRO-100 Series
- TRF-115-005- Roof & Gutter Deicing
- WSM-252W Smart WiFi Panel
- WSM-63 Relay Timer Panel
Outdoor Sensors
Pipe Trace
Repairs
- Digital multimeter
- Infrared Thermal Camera
- Megger (acc-megg)
- Repair – Outdoors
- Repair Kit – End Cap
- Repair Kit – Joint
- Repair Kit – Wire
- TDR Meter Cable Tester
Snow and Ice Melting
- Dual Cable Tester
- Self-Regulating De-Icing Cable – SRK
- Snow Melting Cable – WSM
- Snow Melting Mat – WSMM