How long should I program my CommBox to melt snow?

1 min read · Updated May 2022
COMMBOX-600

It will vary depending on the depth of the cable in the material (concrete, pavers or asphalt) and the voltage input into the cable (280-240-277). The lower the cable is embedded and the lower the voltage, the longer the system will have to run.

 

It is clear that pre-runs and anticipation of the snowfall is critical for a successful system. In the event of high precipitation, manually activating the system several hours prior is recommended, as it will actually reduce the total run-time as melting will occur faster by preventing build-up. When snow has had the chance to build up, it takes significantly longer to melt it.

 

Two hour run times per zone is typical. Make sure that zone 1 (contactor 1) is the most critical area (such as a walkway to the door or tire-tracks) as zones 2 and following will experience build-ups and take longer to heat up.

 

Commbox 2

 

Please read over the instruction manual to familiarize yourself with the Box capabilities and settings. 

Quoting Tools: instant, accurate, flexible

Warmup offers an extensive range of electric floor systems compatible with all floor types, rooms and projects.

ⓘ Enter your first name.
ⓘ Enter your last name.
ⓘ Enter your phone number.
ⓘ Enter your postal code.
ⓘ Please enter a valid email address.
ⓘ Select at least one option.
Select a file or move here
Scroll to Top