Barnsbury Place, England

The Challenge
To create a system design that met the stringent requirements of the client (consistent 22°C room temperature with outside temperature of -4°C) but also had to be simple enough to install in record time. The contractor had never installed any floor heating systems before so they had to be trained on site. To remain on-schedule, we had to design, price and supply the systems for one floor at a time (22 bedroom flats) within a week of receiving initial plans.
The Solution
The client had successfully tendered for the project including an in slab under floor heating system as a primary heat source.Within a week of receiving initial plans, the system design was supplied and the objective defined. They were steered away from in slab heating to foil heaters. The floor finishes were laminate and carpet, so the inclusion of heat pak on the carpeted areas meant that the same system could be used throughout.
The Result
Warmup met all scheduled installations and were rated as the most impressive supplier, not just on this site but by the contractor, Bowmite who rated us as 'excellent'.
Quick Quote